Tuesday, 4 March 2014

Assignment Brief 2: Task 5 - Pre Production Planning (Contingency Plan)

Contingency Plan
Name: Jordan Fricker

Production: Music video for The Loveable Rogues – Honest ft. Ms D

Potential problems and how to overcome these problems:

A potential problem that may arise is the weather may turn bad and start raining/snowing and this could damage the equipment. We can prevent this by covering the equipment while filming or we could film inside so the equipment doesn’t get ruined.
Another potential problem is that trains may not be running so we wouldn’t be able to get to the location we wanted to film at. W e can overcome this by driving to the locations that we need to go to or we could wait until the trains are running again.

No comments:

Post a Comment