Assignment Brief 2: Task 5 - Pre Production Planning (Shooting Schedule)


Shooting Schedule
Day
Scene
Location
Equipment
Costumes
Props
Cast +Crew
1

1

1

1

2

2

2

2

2
1

2

3

4

5

6

7

8

9
London

London

London

London

Southend

Southend

Southend

Southend

Southend

Camera
Tripod
Camera
Tripod
Camera
Tripod
Camera
Tripod
Camera
Tripod
Camera
Tripod
Camera
Tripod
Camera
Tripod
Camera
Tripod
Own clothes

Own clothes

Own clothes

Own clothes

Own clothes

Own clothes

Own clothes

Own clothes

Own clothes
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Guitar
Ukulele
Everyone

Everyone

      Everyone

      Everyone

      Everyone

      Everyone

      Everyone

      Everyone

      Everyone

Assignment Brief 2: Task 5 - Pre Production Planning (Costumes and Props)


Costumes and Props

Character Name: Jack

Costume:
Own clothes







Props: Ukulele
Character Name: Billy

Costume:
Own clothes







Props: Guitar
Character Name: Jordan

Costume:
Own clothes







Props: n/a
Character Name: Jess

Costume:
Own clothes







Props: n/a

Assignment Brief 2: Task 5 - Pre Production Planning (Shot List)


Shot List

Scene
Shot Number
Description
Ukulele


Lead Singer

Band

Looking Around


Train

Southend


Arcade

Girl Singing

Chips
1


2

3

4



5

6


7

8

9
Long shot of the band playing in the middle of London.
Close up of the lead singer singing the start of the song.
Mid shot of the whole band playing the song.
Shot of the band looking around London.
Shot of the band on the train going to Southend.
Shot of the banding walking around Southend.
Shot of the band having fun in the Arcades.
Mid shot of the girl singing.
Shot of the band finishing the song by sitting on a wall eating chips and laughing and joking.

Assignment Brief 2: Task 5 - Pre Production Planning (Production Budget)

Production Budget


Item
Cost
Train Transport (There and back)
Guitar
Ukulele        
Camera
Tripod 


£1.50 - £2.00
£50
£30
£60
£20


Total Production Budget:
£161.50 - £162

Assignment Brief 2: Task 5 - Pre Production Schedule (Risk Assessment)


Risk Assessment
Group Members:                                                                                                Location:
Hazard
Person(s) at Risk
Likelihood of Hazard
1 – Extremely Unlikely
5 – Extremely Likely
Severity of Hazard Outcomes
1 – Very Low Risk
5 – Very High Risk
Risk Level
(Likelihood + Severity)
2
Measures to Take to Manage Risk
Risk Managed?
Y/N
Being hit my vehicles/trains.
Everyone
2
5
3.5
Standing away from moving modes of transport.
Yes
Getting ill from the weather
Everyone
1
2
1.5
Wearing suitable clothing for the weather.
Yes
Falling in the sea
Everyone
2
3
2.5
Not standing to close to the sea and making sure that you are standing on something stable.
Yes

Contacts
Emergency Service:            999
Robert Clack School:
            02082704222
Other Contacts:            Jordan Fricker - 07914771244

Assignment Brief 2: Task 5 - Pre Production Planning (Contingency Plan)

Contingency Plan
Name: Jordan Fricker

Production: Music video for The Loveable Rogues – Honest ft. Ms D

Potential problems and how to overcome these problems:

A potential problem that may arise is the weather may turn bad and start raining/snowing and this could damage the equipment. We can prevent this by covering the equipment while filming or we could film inside so the equipment doesn’t get ruined.
Another potential problem is that trains may not be running so we wouldn’t be able to get to the location we wanted to film at. W e can overcome this by driving to the locations that we need to go to or we could wait until the trains are running again.